Case study

King George V Docks, Glasgow Redevelopment

Client:

Ramboll UK Limited

Project length:

3 weeks

Project Value:

£20,000

Project description:

Phoenix Drilling were appointed by Ramboll UK Limited to undertake an investigation on the King George V Docks. This is the largest dock on the Upper Clyde as well as the only operational one within Glasgow’s city boundary, the investigation formed part of the development of existing infrastructure to create a new facility for the handling, processing, and export of scrap metal.

The works comprised of:

Concrete coring of 13No locations.

7No cable percussive boreholes to 7.00m depth

6No cable percussive boreholes to 15.00m depth

Installation of 2no groundwater monitoring pipes

In-situ testing

Geotechnical sampling

Working around tide constraints and dock operations

a image of a van unloading equipment on the docks

Case Studies

Read about successful projects carried out by Phoenix.

Lossiemouth East Beach Footbridge

Lossiemouth East Beach Footbridge

Case study Lossiemouth East Beach Footbridge Client: Moray Council Consultant: Soiltechnics Project length: 1 week Project Value: £12,000 Project description: Phoenix Drilling were instructed to undertake a ground investigation for the construction of a replacement...

read more
A701 Relief Road and A702 Spur Road, Midlothian

A701 Relief Road and A702 Spur Road, Midlothian

Case study A701 Relief Road and A702 Spur Road, Midlothian Client: Midlothian Council Consultant: RPS Project length: November 2017 to April 2018 Project Value: £180,000 Project description: Phoenix Drilling Limited was appointed to carry out an intrusive ground...

read more